Impact of Climate Change on Dam Safety

| 2023:947 | Claes-Olof Brandesten
Knowledge about the climate and its changes is in strong development and the effects of a changing climate are relevant from a dam safety perspective, with discharge capacity and discharge safety in particular focus. In this project, current and relevant information has been compiled to lay a foundation for strategic climate adaptation work regarding dams.
Bild Till Hemsidan

The report presents a literature review that includes methodology for analysis of and adaptation to climate change, as well as the identification of changes that may affect dam safety. Using the results of the literature review, an analysis of climate change is carried out, which may lead to risks to dam safety.

The analysis is based on the four driving climate parameters temperature, precipitation, wind with their combinations, and sea level. These will generally increase with the exception of wind where the picture is so far unclear. About seventy impact chains are reported that are used to identify risks that can affect dam safety.

The results do not show any new risks, but primarily they are already known risks that may be exacerbated by climate change that is relevant to dam safety.

Rapporter och publikationer

Här listas rapporter och resultatblad från programmet.

    • Rapport

    Statusbedömning av injekteringsridåer

    Injekteringsridåer är en viktig del av dammkonstruktionens tätskikt, med uppgift att begränsa vattenläckage och minska upptryck i berggrunden. Som en del av arbetet med att försäkra dammsäkerheten behövs tillförlitliga metoder för att bedöma injekteringsridåns effektivitet, vilka beskrivs i den här rapporten.

    |2026:1174Yanting Chang, Hans Fridholm, Benny Mohlin, Ingrid Kjellström SWECO
    2026-1174
    • Rapport

    Statusbedömning av komponenter för manövrering av utskovsluckor

    Det här projektet har sammanställt olika metoder för att bedöma status på utskovsluckors olika komponenter. Att bedöma de mekaniska komponenternas skick och kvarvarande livslängd kan minska risken för utebliven manövrering eller oavsiktlig stängning av en utskovslucka och därmed också öka dammsäkerheten vid dammanläggningen.

    |2026:1153Patrik Bennerstedt, Love Ekström, Andreas Halvarsson WSP
    Utskovsluckor
    • Rapport

    Documentation from the dismantling of the Älvkarleby test embankment dam

    The Älvkarleby test dam was built in 2019 and served as a national and international test bed until the fall of 2024. After 4.5 years of operation, the dam was dismantled and thoroughly documented. The dismantling process revealed multiple instances of internal erosion, including signs of material displacement and seepage pathways, indicating potential vulnerabilities in the dam’s structural integrity.

    |2026:1150Johan Lagerlund och Saima Riaz, Vattenfall R&D
    Älvkarleby embankment dam
    • Rapport

    Vägledning för mätning och utvärdering av dammars funktion

    Dammars säkerhet är i ständigt fokus. Den här rapporten visar tydligt hur viktigt det är att ha en helhetssyn vid övervakning av dammar. Grundläggande är en god förståelse för dammens behov, samt kompetens att kunna välja bäst metodik för att upptäcka och följa förändringar. Mätningar måste hålla hög kvalitet så att man kan lita på mätdata vid tolkning och analys.

    |2025:1125Sam Johansson, Magnus Ljunggren, Peter Viklander
    Bild till webben 2025-1125