- Rapport
Gap formation between steel liner and cylinder wall in reactor containment buildings
The reactor containment building is the most important safety barrier in a nuclear power plant. It is a cylindrical, prestressed concrete structure with an embedded steel liner on the inner face of the containment wall, designed to maintain integrity in the event of an internal accident.
2026:1181Nils Janestad, Manouchehr Hassanzadeh, Camilo Rito Pi och Elin Torén Johansson
- Rapport
Methods for detection of rebar in nuclear concrete structures
This project has reviewed non-destructive methods for detecting reinforcement in concrete structures and clarified which tasks can be performed by technically skilled in- house personnel and when specialist support is required.
|2026:1182Magnus Nilson
- Rapport
Deformationer och töjningar resulterande av håltagning i reaktorinneslutning på Ringhals 2
Två öppningar skapades i Ringhals 2:s reaktorinneslutning för att ta ut utrustning.
|2026:1179Manouchehr Hassanzadeh, Sweco
- Rapport
Summary Report – Nuclear Projects 2025
This document contains brief introductions to all projects that were finalized and/or published in Energiforsk Nuclear Portfolio Programs during the year 2025.
|2026:1178Karin Westling, Energiforsk